Rumored Buzz on ยูฟ่าเอสซีอาร์
Compared with an SCR, an SCS can be triggered into conduction any time a destructive voltage/output latest is applied to that same guide.After the SCR starts off conducting, no a lot more gate voltage is necessary to maintain it during the ON state. The least present needed to preserve the SCR from the ON state on elimination with the gate voltage